Page 29 - Demo
P. 29


                                    www.cpi-worldwide.com CPI %u2013 Concrete Plant International %u2013 2 | 2026 29EFFICIENCY, VERSATILITY & INNOVATIONUSA, Inc.Manufacturer of Automated Equipment for the Concrete IndustryTURN-KEY PLANTS%u00abHIGH PERFORMANCE%u00bb vibrating pressesSTATE-OF-THE-ART handling systemsTAILOR-MADE robotic solutionswww.quadra-concrete.comQUADRA40 route de Findrol 74130 Contamine-sur-Arve France Tel. +33 4 50 03 92 21 ICCBP INDIA9 & 10 April 2026GIC ITALY16-18 April 2026BATIMATEC ALGERIA3-7 May 2026BIG 5 SAUDI10-13 May 2026BIG 5 SYRIA19-21 May 2026NEWSBridge with a Main Span from 76-200 FeetSR 520 Montlake to Lake Washington Interchangeand Bridge Replacement Project (Co-Winner)Seattle, Wash.Concrete Technology CorporationProject OverviewThe Washington State Department of Transportation%u2019s (WSDOT%u2019s) vision for the SR 520 Montlake project near Seattle, Wash., was ambitious: reconnect the communities divided by the freeway, construct a safer and seismically sufficient eastbound approach to the new floating bridge, improve regional mobility, ensure vehicle and pedestrian safety, and enhance pedestrian mobility by connecting local trails and paths. Such a massive project required not only extensive coordination and logistical planning, but also the right building material to bring everything together. WSDOT, in partnership with Concrete Technology Corporation and engineering firm TYLin, adopted a wide variety of precast concrete products for the effort. The result was a three-acre landscaped lid structure, a regional shared-use path tunnel, a signature pedestrian land bridge, and a 1.1-mile, 40-span, base-isolated approach bridge. The nearly $500 million project deployed a wide variety of precast concrete components, including 513 girders, 80 columns, 39 diaphragms, and extensive stretches of traffic barriers. Copyright: Graham Contracting
                                
   23   24   25   26   27   28   29   30   31   32   33