                                    CONCRETE PRODUCTS & CAST STONE86 CPI %u2013 Concrete Plant International %u2013 3 | 2025 www.cpi-worldwide.comSite diary in time lapse %u2013 from the groundbreaking to the acceptanceDay 1Sun. 27 degrees Celsius. Blue sky. It is 7:30 a.m. local time when construction crews arrive in the Khalifa Economic Zones Abu Dhabi with machinery to move tons of sand and stones in the coming months. Mark out the foundations and excavate the foundation pits. Create formwork, insert reinforcement and pour concrete. The completed foundations only give a hint of the enormous production plant that opens its doors here about a year later.Steel. As far as the eye can see. Steel beams, steel frames, steel struts are delivered. Machine frames precisely aligned. Everything is geared up for the big day when the first low-loaders arrive. With parts and components that will gradually be assembled into a high-tech plant.Day 113
                                