Page 25 - Demo
P. 25


                                    CONCRETE TECHNOLOGYwww.cpi-worldwide.com CPI %u2013 Concrete Plant International | India Edition %u2013 6 | 2025while an exhaust unit cools (to a minimum of the ambient temperature) the temperature of the specimen if the temperature of the concrete element drops (perhaps due to wind, a failed curing cover, etc.). A cooling system is available as an option for regions which experience harsh winters. The system accurately duplicates the temperature of the concrete element through the use of temperature sensors (located inside or outside the concrete element), available wired or wireless, continuously measure the curing conditions of both the concrete element and the test cylinder.Temperature data from the element and the test cube or cylinder is transmitted to the AutoCure%u00ae control system. If the element%u2019s temperature exceeds that of the test cylinder, the heating system is activated to match the element%u2019s temperature. Conversely, if the element%u2019s temperature drops unexpectedly, an exhaust ventilator or optional cooling system responds to maintain the correct conditions. For QC Quality Control monitoring, recording and verification of the accuracy of the specimen heating curve compared to the concrete element, the VaporWare V2%u00ae system independently records, stores, and prints all climatic curing data, including batch numbers, element descriptions, and timestamps, providing a fully auditable quality record of both the actual concrete product and the specimen in the MatchCure environmental chamber. With Match-Cure, producers gain a precise, controlled simulation of the actual curing conditions experienced by their concrete elements. Prior to demoulding or detensioning the actual concrete element, the specimen in the Match-Cure environmental chamber can be removed and compression tested to determine if the concrete compressive strength is sufficient to withstand the forces or demoulding or detensioning. Large monitor provides data for each production table/form/mould showing current % completion and estimated completion time. Use of green, yellow or red outlines for each production area shows curing status.Effective & efficient: THE connection for precast concrete elementsB.T. INNOVATION GMBHFor faster constructionwww.bt-innovation.deDurable connection of precast concrete elementsConnection without any mineral groutingInstallation independent of weather conditionsNo curing or downtimeImmediate, complete load-bearingImmediately waterproof in combination with RubberElast%u00aeRubberElast%u00aeBT-Spannschloss%u00ae
                                
   19   20   21   22   23   24   25   26   27   28   29