Page 161 - Demo
P. 161


                                    PRECAST CONCRETE ELEMENTSwww.cpi-worldwide.com CPI %u2013 Concrete Plant International %u2013 6 | 2025X-TIE delivers tangible benefits to professionals working daily with steel reinforcement:%u2022 Strength and safety: the two-wire crossed tie ensures stability comparable to welding, with more rigid cages and safe handling during transport.%u2022 Maximum speed: each tying cycle takes just over 1 second, achieving up to +200% productivity compared to manual tying.%u2022 No sparks, no fumes: a safe, clean, and silent process that eliminates risks associated with welding and toxic emissions.%u2022 Superior robustness: uses 1.6 mm wire, double the diameter of standard manual tying wire.%u2022 Low profile: the twist height is less than 10 mm, well below the standard concrete cover of 25 mm.%u2022 Material efficiency: no wire waste, no hidden costs.%u2022 Standard wire availability: no need for special or proprietary consumables.%u2022 Operational versatility: option to select single- or double-crossed ties depending on strength requirements.%u2022 Long-lasting coils: up to 10,000 double ties or 20,000 single ties per coil, drastically reducing downtime.Progress for the precast industryX-TIE is not just a faster machine: it is a solution designed around the real needs of precasters. It reduces cycle times, lowers operating costs, improves workplace safety, and ensures consistent quality. In a sector where meeting deadlines and ensuring the structural integrity of precast elements are critical, relying on a technology that combines the strength of welding with the practicality of automatic tying provides a decisive competitive advantage. nFURTHER INFORMATIONSchnell S.p.a.Via Sandro Rupoli, 2Zona Ind. San Liberio61036 Colli al Metauro (PU), ItalyT +39 0721 878711marketing@schnell.itwww.schnell.itDouble knotEffective & efficient: THE connection for precast concrete elementsB.T. INNOVATION GMBHFor faster constructionwww.bt-innovation.deDurable connection of precast concrete elementsConnection without any mineral groutingInstallation independent of weather conditionsNo curing or downtimeImmediate, complete load-bearingImmediately waterproof in combination with RubberElast%u00aeRubberElast%u00aeBT-Spannschloss%u00ae
                                
   155   156   157   158   159   160   161   162   163   164   165