Page 164 - Demo
P. 164
PRECAST CONCRETE ELEMENTS162 CPI %u2013 Concrete Plant International %u2013 4 | 2025 www.cpi-worldwide.coming to DIN EN 1992-1-1/NA:2013-4 for load-bearing, continuous reinforced concrete walls.Suitable BT formwork systems in the battery include%u2022 Multiform systems with Magfly AP magnets (formwork height 7 cm to approx. 80 cm)%u2022 H-formwork (formwork with integrated magnets, formwork height 6 cm to approx. 35 cm)%u2022 Screwframe (magnetic activation with screw system for formwork heights from 4 cm)Carbon reinforcement mesh (Hitexbau type HTC 34/34-80 with 34 mm x 34 mm mesh opening and 48 mm%u00b2 reinforcement cross-section per metre) was inserted into the battery, which was equipped with Multiform formwork and was still open. The two carbon fibre mats were positioned using magnets and plastic spacers. The aim was to achieve a concrete Concreting in the battery mouldDemoulding and component removal from the battery mould