Page 152 - Demo
P. 152
PRECAST CONCRETE ELEMENTS150 CPI %u2013 Concrete Plant International %u2013 5 | 2025 www.cpi-worldwide.comComprehensive solution adapted to market demandsThis project reflects a 360%u00b0 approach to precast engineering. Moldtech not only provided the equipment but also supported Duhalde in setting up an efficient, safe, and mass-produced plant. All equipment has been designed based on principles of functional compatibility, enabling smooth operations from start to finish.Daily manufacturing capacity is increased thanks to the ability to perform simultaneous processes. While the 3D moulds work on the main structure, the fixed tables produce ceiling and floor slabs in parallel, which are then assembled using the carousel, completing the cycle with efficiency and precision.Furthermore, the robust design of all the equipment ensures a long lifespan, easy maintenance, and safe operation even during long production shifts. This type of solution is especially relevant in today's precast context, where competitiveness demands maximum efficiency, regulatory compliance, and adaptability.Technical and personalized approachEach component of the system has been designed with engineering criteria applied to actual plant use. Moldtech worked closely with the Duhalde Industries technical team to adapt the dimensions, anchoring systems, manoeuvrability, and ergonomics to the client's specific needs.This customized approach has optimized both the equipment's performance and the quality of the final product. The transformer substations produced with this line meet French and European standards for structural strength, insulation, durability, and compatibility with standard electrical equipment. The French precast market: an evolving environmentFrance currently represents one of the most dynamic markets in Western Europe in terms of electricity grid modernization and energy transition. The growing demand for infrastructure associated with renewable energy, rural electrification, and new construction regulations have driven the adoption of precast solutions that guarantee rapid execution, technical traceability, and structural strength.In this context, the use of prefabricated transformer substations has become an increasingly valued alternative for electricity distribution companies, construction companies, and energy project developers. The ability to manufacture in-house, under controlled conditions, and deliver ready-toinstall solutions reduces construction times, logistics costs, and operational risks in the field.Therefore, this project not only responds to a specific need of the client, Duhalde Industries, but also aligns with the structural trends of the French market: industrialization of the sector, automation of the construction process, and a focus on sustainable and adaptable solutions. ConclusionThe project developed with Duhalde Industries not only represents a high-level technical solution, but also an example of business collaboration focused on efficiency and technological innovation in the field of construction industrialization. Moldtech once again demonstrates its ability to integrate engineering, production, and customer support into a comprehensive offering aligned with the challenges of modern precasting.With this new facility in France, Moldtech consolidates its expansion into the European market and reaffirms its commitment to developing precast technologies tailored to each client, each application, and each production environment.nFURTHER INFORMATIONMoldtech S.L. C. Polysol Uno 40, P.I. Piedra Hincada 41500 Alcal%u00e1 de Guadaira (Sevilla), Spain T +34 955 444190 info@moldtechsl.es www.moldtechsl.esFinal result