Page 157 - Demo
P. 157
PRECAST CONCRETE ELEMENTSwww.cpi-worldwide.com CPI %u2013 Concrete Plant International %u2013 5 | 2025when the coil to be processed is changed, without having to use time-consuming butt-welding units. To do this, the last coil piece is driven out to the front in the direction of production and the new rebar is inserted into the rotor with the driven fixture and wire guide units, without having to readjust the rollers of the rotor.Time is also saved when changing the bending radius, as this takes place automatically without delay. All bending radii are located on a retractable bending tool attached on the bending modules. The bending modules do not have to travel to the changeover station, as this is the case with the widely used systems, with a great loss of time.Due to the sophisticated and compact design, all components of the Syntheton are easily accessible and require minor maintenance. nFURTHER INFORMATIONEurobend GmbHAlexanderstr. 190547 N%u00fcrnberg-Stein, Germanyinfo@eurobend.comwww.eurobend.comMELC Monoline machine up to 25mmSOMMER Anlagentechnik GmbHBenzstrasse 1 | D-84051 Altheim/GermanyTel: +49 (0) 87 03 / 98 91-0 | Fax: +49 (0) 87 03 / 98 91-25info@sommer-precast.de | www.sommer-precast.de| Stationary line production| Tilting tables| Pallet circulation plants| Transport and handling systems| Multi-Function-Shuttering-Robot (MFSR)| Concrete distribution systems for all purposes| Compacting systems| Finishing equipment| Shuttering systems| Shuttering for special purpose elements| Moulds for garages/moulds for rooms/special purpose elements| Shuttering for skeleton building systems| Moulds for columns/moulds for girders/moulds for TT-elements| Insulation-Process-Application-Robot (IPAR)| Shuttle-Processing-Plant (SPP)Production Engineering and Automation Systems for the Prefabricated Concrete Element Industry