Page 148 - Demo
P. 148


                                    PRECAST CONCRETE ELEMENTS146 CPI %u2013 Concrete Plant International %u2013 4 | 2025 www.cpi-worldwide.comWhat quantities of steel are needed ad hoc? And when are the desired raw materials particularly cheap? These and other dashboards are intended to provide information in a clear and transparent manner, which the company hopes will further improve profitability.Special transport and claim management: Ideas for automated processesThe next few months will be characterised by the implementation of various workflow automations,\and Feichter. Here, too, there are already ideas for further optimisations for more efficient and consistent value-adding work. Special transports for particularly large precast elements are one example: Every Friday, the scheduling department receives an e-mail shortly informing them of parts that require special transport. Raw data serves as the basis for this product information, and employees in the scheduling department can thus plan special transport operations in a dedicated manner.There will also be automation to improve communication with the customer: The aim of this process is to ensure that ordered products are collected by the customer within the planned time frame so that the storage locations are available again for new parts. Customers receive an e-mail asking them to confirm the desired date. If a stock deadline is exceeded, the system automatically forwards notifications to the responsible employees.Technician matrix with all qualifications and availabilitiesAutomated technician assignment in RIB One Prefab ERP should ensure smooth production throughout. Around 50 technicians, some with different qualifications, work at the various Oberndorfer sites. Scales, volumes and the type of precast elements that are produced are criteria that require a technician with specialised skills. In addition to the qualifications, the availability and capacity utilisation of the employees in this area are also stored in a matrix in the RIB system, so that nothing stands in the way of trouble-free and prompt production. The information is to be provided either via the planning and time recording integrated in RIB One Prefab ERP or via a separate program docked onto the RIB application.Optimised logistics with the right loading and work equipmentThe company also plans to track loading equipment and work equipment using the RIB software. Specific work proProduction of precast elements: RIB BI+ has made it possible to determine production planning and its utilisation in detail.%u00a9Franz Oberndorfer GmbH & Co. KGThe company is currently planning to track loading equipment and work equipment via RIB One Prefab. Specific work processes for transport are currently being developed that take into account the correct loading and work equipment with all the important details. A workflow is designed that carries out all the necessary checks in advance, thus ensuring that logistics are always optimised and error-free.%u00a9Franz Oberndorfer GmbH & Co. KG
                                
   142   143   144   145   146   147   148   149   150   151   152