Page 66 - Demo
P. 66
PRECAST CONCRETE ELEMENTS66 CPI %u2013 Concrete Plant International | India Edition %u2013 1 | 2026 www.cpi-worldwide.comThe newly installed collection trolley on the ESR straightening and cutting machine optimises logistics in reinforcement processing.Even after the go-live, the project team continued to provide a high level of support. The management states: %u201cThe collaboration with the Progress project team was and continues to be excellent. I have rarely experienced such constructive and efficient cooperation within a software project.%u201dTransparency and process proximity%u201cAhead makes order processing much more transparent; every step can be tracked in real time, from order acceptance to delivery,%u201d. This takes quality assurance and traceability of individual process steps to a whole new level. In ahead, every step can be documented, controlled and tracked %u2013 not only during production, but also after the elements have been delivered to the customer's construction site.The ahead software is used for production planning, where it increases efficiency and flexibility.Around 40 employees use ahead along the entire value chain at Baumat.

