Page 129 - Demo
P. 129
CONCRETE PIPES AND MANHOLESwww.cpi-worldwide.com CPI %u2013 Concrete Plant International %u2013 2 | 2026 129FURTHER INFORMATIONWebeco nvLichtenberglaan 2090 (ind. Brustem)3800 Sint-Truiden, BelgiumT +32 11 765719info@webeco.bewww.webeco.beRekers GmbHMaschinen- & AnlagenbauGerhard-Rekers-Str.148480 Spelle, GermanyT +49 5977 9360info@rekers.dewww.rekers.deFuture-proof design %u2013 construction phase II already taken into accountA key feature of the new plant is its consequent future orientation. Interfaces have already been provided for in the current expansion stage so that an inspection and testing track can be integrated in construction phase II, as was the case with plant 1. Pipe transport car I, which pre-cycles three pipes simultaneously, can also be retrofitted. This gives Webeco a high degree of flexibility for future quality requirements, standards and market needs.ConclusionWith its second concrete pipe line, Webeco impressively underlines its claim to be one of the technologically leading and innovative manufacturers of precast concrete elements. The rapid follow-up investment demonstrates not only economic strength, but also great confidence in modern, automated production concepts.With this plant, Rekers Maschinen- und Anlagenbau has once again demonstrated its expertise as a system partner %u2013 with high-end handling technology, robot-based pallet ring cleaning, ergonomic sealing application and a modular plant concept that goes far beyond current requirements. An investment that sets standards %u2013 today and for the coming years. nStorage block in the outdoor area for the cured pipes

