PRECAST CONCRETE ELEMENTS152 CPI %u2013 Concrete Plant International %u2013 2 | 2026 www.cpi-worldwide.com%u2022 Significantly reduces logistics costs.%u2022 Minimises risks associated with transporting heavy components on public roads.%u2022 Allows production to be scheduled precisely in line with construction progress.%u2022 Enhances traceability and dimensional control of each element.The ability to produce beams directly along the alignment ensures continuous supply and avoids bottlenecks that could delay the construction of viaducts, one of the most critical phases of the project.Modularity and system relocationOne of the most outstanding features of the 1,500-tonne prestressing lines is their modular design, consisting of sections approximately 12.5 metres long, assembled using highstrength bolted connections. This design allows for:%u2022 Transport of each module on standard trucks without the need for special convoys.%u2022 Assembly of the prestressing lines directly on the construction site.%u2022 Dismantling of the equipment once a section has been completed.%u2022 Reinstallation at another location along the A8 corridor or on future projects, maximising the service life of the system.Once beam production for Section I is completed, the prestressing lines will be dismantled and relocated to a new site, reflecting the operational flexibility required for large linear infrastructure projects.Strategic relevance of the A8 highway sectionAccording to data published by the main contractor, the scope of works for this section includes:%u2022 24.4 km of new highway.%u2022 30 prefabricated bridges with a combined length exceeding 2,500 metres.%u2022 2 additional steel bridges.%u2022 Underpasses, interchanges, service areas and maintenance facilities.The large number of structures generates a sustained demand for prestressed beams, a critical component for enabling simultaneous progress on multiple construction fronts. The adoption of industrialised solutions such as on-site prestressing lines allows construction activities to be accelerated without compromising quality.A key project for regional connectivityThe A8 highway is a priority project within Romania%u2019s national development plan and is expected to:%u2022 Significantly reduce travel times between regions.Precast prestresses beams