Page 176 - Demo
P. 176


                                    READYMIX CONCRETE176 CPI %u2013 Concrete Plant International %u2013 3 | 2025 www.cpi-worldwide.comConcrete residues in truck mixer drums pose one of the biggest challenges in the everyday life of concrete plants. While fresh concrete has to be removed on a daily basis, hard deposits settle in the drum over time and can only be removed with great effort. Walter Ger%u00e4tebau GmbH, a family-run company with over 50 years of experience in the manufacture of cleaning systems, offers an efficient and safe solution to precisely this problem - the Cleanjet 2-in-1.The special feature of the Cleanjet 2-in-1 lies in its combination of medium-pressure cleaning (220 bar) for daily use and ultra-high-pressure cleaning (1500 bar) for the periodic removal of hardened concrete. The system therefore combines two cleaning processes in one compact and user-friendly unit %u2013 and not only increases the service life of the truck mixers, but also significantly reduces downtimes and manual work.More safety for workers and machineryA key feature of the Cleanjet 2-in-1 is the significant increase in occupational safety: the automated cleaning process completely eliminates the need for dangerous manual chiselling in the drum. Employees no longer have to enter narrow, hard-to-reach areas, which provides a significant increase in safety, especially with regard to legal requirements and occupational health and safety measures. The system is controlled Innovative solution for the efficient cleaning of truck mixer drumsWalter Ger%u00e4tebau GmbH, 74343 Sachsenheim-Ochsenbach, Germany Walter brings efficiency to truck mixer cleaning with the Cleanjet 2-in-1.
                                
   170   171   172   173   174   175   176   177   178   179   180